"Fossies" - the Fresh Open Source Software Archive  

Source code changes of the file "Tests/RunCMake/include_external_msproject/check_utils.cmake" between
cmake-3.13.4.tar.gz and cmake-3.14.0-rc1.tar.gz

About: CMake is a cross-platform build system designed to build, test and package software. Release candidate.

check_utils.cmake  (cmake-3.13.4):check_utils.cmake  (cmake-3.14.0-rc1)
skipping to change at line 101 skipping to change at line 101
set(sep "") set(sep "")
set(failed "") set(failed "")
if(NOT type) if(NOT type)
set(type 8BC9CEB8-8B4A-11D0-8D11-00A0C91BC942) set(type 8BC9CEB8-8B4A-11D0-8D11-00A0C91BC942)
endif() endif()
if(NOT platform) if(NOT platform)
if(RunCMake_GENERATOR_PLATFORM) if(RunCMake_GENERATOR_PLATFORM)
set(platform "${RunCMake_GENERATOR_PLATFORM}") set(platform "${RunCMake_GENERATOR_PLATFORM}")
elseif("${RunCMake_GENERATOR}" MATCHES "Win64") elseif("${RunCMake_GENERATOR}" MATCHES "Win64")
set(platform "x64") set(platform "x64")
elseif(VS_PLATFORM_NAME)
set(platform "${VS_PLATFORM_NAME}")
else() else()
set(platform "Win32") set(platform "Win32")
endif() endif()
endif() endif()
if(NOT imported_release_config_name) if(NOT imported_release_config_name)
set(imported_release_config_name "Release") set(imported_release_config_name "Release")
endif() endif()
if(guid) if(guid)
check_project_guid("${sln}" "${name}" "${guid}" passed_guid) check_project_guid("${sln}" "${name}" "${guid}" passed_guid)
if(NOT passed_guid) if(NOT passed_guid)
 End of changes. 1 change blocks. 
0 lines changed or deleted 2 lines changed or added

Home  |  About  |  Features  |  All  |  Newest  |  Dox  |  Diffs  |  RSS Feeds  |  Screenshots  |  Comments  |  Imprint  |  Privacy  |  HTTP(S)